This work consists of removing areas of sidewalk and replacing the areas with six” reinforced, `seeded’ exposed aggregate sidewalks in various locations. Work also includes removal and replacement of curbs, gutters and ADA ramps. All sidewalk and ramps shall comply with ADA regulations. In certain areas additional soil is to be removed and replaced with an approved topsoil mix. All areas are within the jurisdiction of the Architect of the Capitol (AOC).