Mill, saw cut, remove, and replace the existing asphaltic concrete down to the base. Encompasses the area from inside the FAA’s security slide gate entrance, the main access drives up to the building, the drive around the building including the parking areas, approximately 35,000 ft2. Install new asphalt a minimum 4-inch thick (compacted) field verify conditions, dimension, and quantities. Install 6 manhole risers and install stone on the road edge to prevent erosion and road wash away. Install new Loop Sensor for the gate.